Electrical engineering
Power and low current, from the incoming supply to the last outlet.
ViewStudy, sizing, tendering, site supervision and commissioning — every SIA phase, across all four disciplines.
Power and low current, from the incoming supply to the last outlet.
ViewGeneration, distribution, emission, control — and the water services.
ViewPeriodic inspection, remediation, safety certificate.
ViewRenewing services without decanting the tenants.
ViewPut the market in competition and evidence the decision.
ViewCertificates, Minergie, heat pumps, subsidy files.
ViewYes, after a short audit of the existing file, quoted separately. It states plainly what can be carried forward and what has to be redone.
We work in whatever coordination environment the design team has set up and deliver the agreed formats. The model does not replace the calculation or the schematic.
For an apartment block, usually three to five weeks from the site visit, depending on how complete the record drawings are.
Tell us the building and the stage it is at. You will get an assessment and a fixed fee per phase, with no obligation.