Construction standard

Minergie: a calculation, not a badge

The standard requires calculated values, controlled ventilation and verified workmanship. We prepare the evidence and carry it to certificate.

Variants
Minergie · Minergie-P · Minergie-A
Requires
Heat demand, ventilation, generation, airtightness
Stage
From preliminary design — later gets expensive
Outcome
Provisional, then definitive certificate

Decide early

Minergie cannot be added at the end. The standard affects compactness, glazing areas, ventilation routing and the choice of heat source — all decisions taken at preliminary design. Starting the evidence during construction means paying for corrections.

We run the calculation alongside the design, so every option is checked against the standard as it is considered.

The stages

Pre-check
Feasibility of the standard for this building, with the critical points identified.
Application
Evidence calculation and submission for the provisional certificate.
Construction
Checking that what was calculated is what gets built — airtightness and ventilation above all.
Completion
Measurements, balancing, definitive certificate.
Frequently asked

Questions about Minergie

Is Minergie possible in an existing building?

Yes, with the variant intended for refurbishment. Feasibility depends on the envelope and on where ventilation can be routed.

What does the standard add to the cost?

It mostly moves cost: more in envelope and ventilation, less in plant and in operation. The pre-check gives the order of magnitude.

Is controlled ventilation mandatory?

In practice yes — the standard requires a controlled air change that cannot be evidenced with opening windows.